Home > Along the South China > Hong Kong > Berthing Facilities
 
Location:
Tsim Sha Tsui, Kowloon Peninsula
Maximum Displacement Tonnage:
50,000 tonnes
Draft Allowance: 10 metres
Air Draft Restriction: No
Number of Berths: 2
Length: South Berth 381 metres, North Berth 320 metres
Width: 76.2 metres
Apron Width: 9.0 metres
   
 
 
Location:
Kennedy Town, Western District, Hong Kong Island
 
 
Location:
Kwai Tsing, New Territories
 
 
Location:
Kwai Tsing, New Territories
 
 
Location:
Kwai Tsing, New Territories
 
 
Location:
Kwai Tsing, New Territories
Remarks: Has experience in berthing cruise vessels
 
 
Location:
Kwai Tsing, New Territories
Remarks: Has experience in berthing cruise vessels
 
 
Location:
Victoria Port
Remarks:
The Marine Department operates and maintains 29 mooring buoys for sea-going vessels. Of these 19 are suitable for ships up to 183 metres in length and 10 for ships up to 137 metres.
 
 
Location:
Former Kai Tak runway
The new cruise terminal with the following development parameters will be able to accommodate the most up-to-date cruise vessel commissioned or built to date.
Number of Berths: 2 or more cruise vessels including mega vessels
Displacement Tonnage: 110,000 tonnes
Gross Tonnage: 220,000 tonnes
Draft: 12 metres
Length of Apron Area: 850 metres
Air Draft Restriction: No
 
 
 
Introduction Berthing Facilities Attractions Tour Contact